MULTI’s Tunnel Engineering Experience limited to design and construction supervision of Kali Gandhaki Hydropower 144 MW financed by ADB, and current ongoing water tunnel (26.5 km) in Melamchi Water Diversion Tunnel financed by Nordik Development Fund/ADB. Multi has a very strong presence of Tunnel Engineers and Geologists.